1, mixer should set in the flat position, with wooden pad front and rear wheels, so that the tire put overhead, order to avoid walking in when it is moving. 2, mixer should implement two leakage prote
Let''''s introduce the exact procedure of feeding a shotcrete machine 1, The prototype made in attendance Restructuring seat body, in which the body and then add a section attendance to the mounted acc
Detailed operation of shotcrete machine feeding : 1, The prototype made in attendance Restructuring seat body, in which the body and then add a section attendance to the mounted accelerator hopper and
1. Checking if the steel bar bender machinery properties is good. Working disk and steel bar bender table keep level, ready well each kind the core shaft tool shift 2. Install the core shaft and other
1.Before construction, must make sure the tools, equipment, and raw-material is complete and intact. 2.Make sure the construction place safe before shortcreting, draw out the pumice of shortcereting a
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen